Phone UK  (+44) 028 92441175
Flag IRL  (+353) 01 5256711
Email  
By admin | Published: December 10, 2011

Case Study – CG Power Systems

Project Details

  • Client: CG Power Systems
  • Specialist Contractor: Larsen Contracts Ltd
  • Application: 10,000m2 of Degafloor MMA screeds and coatings
  • Market: Heavy Industrial, Resin Flooring

CG Power Systems are a world leader in the area of power and distribution transformers, related solutions and services. Operating from a purpose built production facility constructed in the 1970s, CG Power Systems decided to upgrade the factory to include high specification flooring. The installation of 10,000 m2 was a challenge that Larsen had the resources, expertise and commitment to deliver as the main contractor on the project. All works were to be completed outside working hours with minimum down time. The flooring specification was developed in conjunction with Degafloor and after samples of the proposed floor were laid and approved. Production and facilities management from CG Power Systems decided on the programme works to be completed at weekends and shutdowns over a two year period. Larsen Contracts supplied and applied Degafloor MMA screeds to production lines, storage areas and plant rooms as well as carried out related preparation works. All locations had to be available so that production could continue uninterrupted every Monday morning!

[ssba]