Project Details
- Client: Navan Shopping Centre
- Main Contractor: Larsen Contracts
- Application: Degafloor 50/51; Degafloor MMA slip resistant system to high traffic car park ramp.
- Market: Retail
Larsen Contracts were appointed to replace the existing ramp surface of the main entrance of the popular Navan Shopping Centre MSCP with an MMA anti-slip system. The car park remained open the entire time and great care was taken to ensure that the ramp would be fully functional during business hours. Works to the ramp was completed in two night shifts, which were scheduled between the hours of 22:00 and 06:00 the following morning.