Aldi Sandyford FloorBridge Joint | Having been approached able solution for a leaking, pre-existing joint located in Aldi's main car park entrance, Larsen Contracts put forward the FloorBridge joint specification. | Read More | |
---|---|---|---|
Andersons Court Waterproofing | Larsen Contracts were approached to resolve water ingress to the lower level properties. This was due to the failed existing waterproofing along the walkways above the dwellings. | Read More | |
Currie P.S., Belfast Waterproofing | As part of the upgrading of the wooden sports floor at Currie Primary School, Belfast; Larsen Contracts were approached to find a waterproofing solution. | Read More | |
Illies Water Treatment Concrete Protection & Coating Works | Larsen Contracts caried out work to six concrete, internal water treatment tanks servicing the Inishowen area. | Read More | |
Bruff & Croom Water Tower Rehabilitation Works | Larsen Contracts were appointed Principal Contractor for the Construction Stage through an open tendering procedure to repair and reinstate water towers. | Read More | |
Dublin Airport | With millions of travellers annually, Dublin Airport Authority must meet the needs of all their customers. Drinking water is needed for a multitude of round the clock operations. | Read More |